Gong Weihui, Zou Yongbin, Xiong Bing, Yin Ziyang. STUDY ON THE DESIGN MODIFICATION OF A /O DITCH PROCESS[J]. ENVIRONMENTAL ENGINEERING , 2015, 33(1): 40-44. doi: 10.13205/j.hjgc.201501010
Citation:
Gong Weihui, Zou Yongbin, Xiong Bing, Yin Ziyang. STUDY ON THE DESIGN MODIFICATION OF A /O DITCH PROCESS[J]. ENVIRONMENTAL ENGINEERING , 2015, 33(1): 40-44. doi: 10.13205/j.hjgc.201501010
Gong Weihui, Zou Yongbin, Xiong Bing, Yin Ziyang. STUDY ON THE DESIGN MODIFICATION OF A /O DITCH PROCESS[J]. ENVIRONMENTAL ENGINEERING , 2015, 33(1): 40-44. doi: 10.13205/j.hjgc.201501010
Citation:
Gong Weihui, Zou Yongbin, Xiong Bing, Yin Ziyang. STUDY ON THE DESIGN MODIFICATION OF A /O DITCH PROCESS[J]. ENVIRONMENTAL ENGINEERING , 2015, 33(1): 40-44. doi: 10.13205/j.hjgc.201501010
According to the high concentrations of industrial wastewater in chemical industrial park,through the analysis of
problems existing in original ordinary A2
/O process,the improved A2
/O ditch process was put forward. The transformation
operation results showed that the removal rate of COD NH3 -N TP was 57. 26% 76. 94% and 98. 36% respectively; and
indexes of the effluent by the biochemical system achieved the first level standard : Integrated Wastewater Discharge
Standard ( GB 8978 1996) .