LIU Jing-jing, XIE Wei-ke, ZHANG Bo, LI Chao, LI Yong-jian, DING Zhuo, CUI Hai-hang, WANG Yi. THROUGH-FLOW CHARACTERISTICS OF GRAVEL FILTER BED OF AN ACTUAL RIVER COURSE BASED ON NUMERICAL SIMULATION OF MIKE 21: A CASE STUDY OF ECOLOGICAL RESTORATION PROJECT IN A RIVER COURSE IN HANZHONG CITY[J]. ENVIRONMENTAL ENGINEERING , 2021, 39(1): 47-50,147. doi: 10.13205/j.hjgc.202101006
Citation:
LIU Jing-jing, XIE Wei-ke, ZHANG Bo, LI Chao, LI Yong-jian, DING Zhuo, CUI Hai-hang, WANG Yi. THROUGH-FLOW CHARACTERISTICS OF GRAVEL FILTER BED OF AN ACTUAL RIVER COURSE BASED ON NUMERICAL SIMULATION OF MIKE 21: A CASE STUDY OF ECOLOGICAL RESTORATION PROJECT IN A RIVER COURSE IN HANZHONG CITY[J]. ENVIRONMENTAL ENGINEERING , 2021, 39(1): 47-50,147. doi: 10.13205/j.hjgc.202101006
LIU Jing-jing, XIE Wei-ke, ZHANG Bo, LI Chao, LI Yong-jian, DING Zhuo, CUI Hai-hang, WANG Yi. THROUGH-FLOW CHARACTERISTICS OF GRAVEL FILTER BED OF AN ACTUAL RIVER COURSE BASED ON NUMERICAL SIMULATION OF MIKE 21: A CASE STUDY OF ECOLOGICAL RESTORATION PROJECT IN A RIVER COURSE IN HANZHONG CITY[J]. ENVIRONMENTAL ENGINEERING , 2021, 39(1): 47-50,147. doi: 10.13205/j.hjgc.202101006
Citation:
LIU Jing-jing, XIE Wei-ke, ZHANG Bo, LI Chao, LI Yong-jian, DING Zhuo, CUI Hai-hang, WANG Yi. THROUGH-FLOW CHARACTERISTICS OF GRAVEL FILTER BED OF AN ACTUAL RIVER COURSE BASED ON NUMERICAL SIMULATION OF MIKE 21: A CASE STUDY OF ECOLOGICAL RESTORATION PROJECT IN A RIVER COURSE IN HANZHONG CITY[J]. ENVIRONMENTAL ENGINEERING , 2021, 39(1): 47-50,147. doi: 10.13205/j.hjgc.202101006
THROUGH-FLOW CHARACTERISTICS OF GRAVEL FILTER BED OF AN ACTUAL RIVER COURSE BASED ON NUMERICAL SIMULATION OF MIKE 21: A CASE STUDY OF ECOLOGICAL RESTORATION PROJECT IN A RIVER COURSE IN HANZHONG CITY
In order to explore the through-flow characteristics of gravel filter bed (GFB) in river water restoration, a river ecological restoration project in Hanzhong, Shaanxi Province, was taken as an objective case, and the hydrodynamic model of the river was constructed by using MIKE 21 software. By simulating the flow conditions of the main channel and GFB under the designed flow rate, the velocity and water level distribution of the channel were obtained, and the flow characteristics of gravel filter bed were calculated. The results showed that according to the distribution of flow, the water flow that entered GFB only accounted for (1.00±0.25)% of the designed flow in the river. Therefore, GFB played a limited role in river water restoration in practice. The study suggested that GFB built in a real river channel was a complex system with bypass system. So, hydraulic retention time, flow times of filter bed and flow capacity of river channel should be considered comprehensively in design, which had certain significance for the similar project cases.
JUANG D F, TSAI W P, LIU W K, et al. Treatment of polluted river water by a gravel contact oxidation system constructed under riverbed[J]. International Journal of Environmental Science and Technology, 2008, 5(3):305-314.
LIN J L, TU Y T, CHIANG P C, et al. Using aerated gravel-packed contact bed and constructed wetland system for polluted river water purification:a case study in Taiwan[J]. Journal of Hydrology, 2015, 525:400-408.
Danish Hydraulic Institute (DHI). A Modeling System for Rivers and Channels Reference Manual[R]. 2005.
NIGUSSIE T A, ALTUNKAYNAK A. Modeling the effect of urbanization on flood risk in Ayamama Watershed, Istanbul, Turkey, using the MIKE 21 FM model[J]. Natural Hazards, 2019, 99(2):1031-1047.