Citation: | WANG Lin, YANG Muyan, GAO Yuqiang. CALCULATION AND ANALYSIS OF CARBON EMISSION IN CONSTRUCTION STAGE OF LOESS TUNNEL[J]. ENVIRONMENTAL ENGINEERING , 2023, 41(10): 99-107,172. doi: 10.13205/j.hjgc.202310013 |
[1] |
LIU Y Y, WANG Y Q, LI D, et al.Life cycle assessment for carbon dioxide emissions from freeway construction in mountainous area:primary source, cut-off determination of system boundary[J].Resources Conservation & Recycling, 2019, 140:36-44.
|
[2] |
交通运输部.2022年交通运输行业发展统计公报[EB/OL].https://xxgk.mot.gov.cn/2020/jigou/zhghs/202306/t20230615
_3847023.html.
|
[3] |
RODRÍGUEZ R, PÉREZ F.Carbon foot print evaluation in tunneling construction using conventional methods[J].Tunnelling and Underground Space Technology, 2021, 108:103704.
|
[4] |
SUN H, PARK Y.CO2 emission calculation method during construction process for developing BIM-based performance evaluation system[J].Applied Sciences, 2020, 10(16):5587.
|
[5] |
郭春, 郭亚林, 陈政.交通隧道工程碳排放核算及研究进展分析[J].现代隧道技术, 2023, 60(1):1-10.
|
[6] |
李伟, 陈刚, 曹太波, 等.地铁盾构渣土利用与处置碳排放强度与减碳潜力研究[J].环境工程, 2023, 41(7):53-60.
|
[7] |
MAHMOOD A, VARABUNTOONVIT V, MUNGKALASIRI J, et al.A tier-wise method for evaluating uncertainty in life cycle assessment[J].Sustainability, 2022, 14(20):1-9.
|
[8] |
徐丽笑, 王亚菲.我国城市碳排放核算:国际统计标准测度与方法构建[J].统计研究, 2022, 39(7):12-30.
|
[9] |
YANG Y, HEIJUNGS R, BRANDAO M.Hybrid life cycle assessment (LCA) does not necessarily yield more accurate results than process-based LCA[J].Journal of Cleaner Production, 2017, 150(MAY1):237-242.
|
[10] |
UNFCCC.Kyoto Protocol to the United Nations Framework Convention on Climate Change (UNFCCC)[J].FCCC/CP/1997/L.7/Add.1, 1997.
|
[11] |
王梦林, 程梦雨, 康皓, 姜立.变电建筑碳排放计算方法研究与低碳案例实践[J].智能建筑与智慧城市, 2023(4):98-100.
|
[12] |
张孝存.建筑碳排放量化分析计算与低碳建筑结构评价方法研究[D].哈尔滨:哈尔滨工业大学, 2018.
|
[13] |
中华人民共和国住房和城乡建设部, 国家市场监督管理总局.建筑碳排放计算标准:GB/T 51366-2019[S].北京:中国建筑工业出版社, 2019.
|
[14] |
汪慧颖.广西高速公路建设期碳排放计算及预测研究[D].南宁:广西大学, 2022.
|
[15] |
龚志起, 张智慧.水泥生命周期中物化环境状况的研究[J].土木工程学报, 2004, 37(5):86-91.
|
[16] |
黄旭辉.地铁土建工程物化阶段碳排放计量与减排分析[D].广州:华南理工大学, 2019.
|
[17] |
粟月欢, 张宇, 段华波, 等.地铁建设环境影响评估及减排效益研究:以深圳市为例[J].环境工程, 2022, 40(5):184-192
, 236.
|
[18] |
SHAN Y, GUAN D, ZHENG H, et al.Data Descriptor:China CO2 emission accounts 1997-2015[J].Scientific DATA, 2018.
|
[19] |
LIU M H, JIA S Y, HE X T.A quota-based GHG emissions quantification model for the construction of subway stations in China[J].Journal of Cleaner Production, 2018, 198:847-858.
|
[20] |
LLOYD S M, RIES R.Characterizing, propagating, and analyzing uncertainty in life-cycle assessment:a survey of quantitative approaches[J].Journal of Industrial Ecology, 2007, 11(1):161-179.
|
[21] |
ANSAH M K, CHEN X, YANG H X, et al.Developing a tier-hybrid uncertainty analysis approach for lifecycle impact assessment of a typical high-rise residential building[J].Resources Conservation and Recycling, 2021, 167:105424.
|
[22] |
KHAN S A, ALAM T, KHAN M S, et al.Life cycle assessment of embodied carbon in buildings:background, approaches and advancements[J].Buildings, 2022, 12(11):1944.
|
[23] |
YU B, LIU Q, GU X Y, et al.Data quality and uncertainty assessment methodology for pavement LCA[J].International Journal of Pavement Engineering, 2018, 19(516):519-525.
|
[24] |
YOO W, OZER H, HAM Y.System-level approach for identifying main uncertainty sources in pavement construction life-cycle assessment for quantifying environmental impacts[J].Journal of Construction Engineering & Management, 2019, 145(2):04018137.
|
[25] |
王贤卫, 吴灵生, 杨东援.高速公路建设CO2排放计算分析[J].公路交通科技, 2014, 31(2):150-158.
|
[26] |
郭春, 徐建峰, 张佳鹏.隧道建设碳排放计算方法及预测模型[J].隧道建设(中英文), 2020, 40(8):1140-1146.
|
[27] |
XU J F.Influence of lining design parameters on the greenhouse gas emissions of chinese highway tunnel construction[J].Transportation Research Record, 2021, 2675(11):685-698.
|
[28] |
XU J F, GUO C, CHEN X F, et al.Emission transition of greenhouse gases with the surrounding rock weakened:a case study of tunnel construction[J].Journal of Cleaner Production, 2019, 209(FEB.1):169-179.
|
[29] |
SEO Y, KIM S M.Estimation of materials-induced CO2 emission from road construction in Korea[J].Renewable & Sustainable Energy Reviews, 2013, 26:625-631.
|
[30] |
HUANG L Z, BOHNE R A, BRULAND A, et al.Life cycle assessment of Norwegian road tunnel[J].The International Journal of Life Cycle Assessment, 2015, 20(2):174-184.
|