Source Journal of CSCD
Source Journal for Chinese Scientific and Technical Papers
Core Journal of RCCSE
Included in JST China
Volume 42 Issue 1
Jan.  2024
Turn off MathJax
Article Contents
XU Changqing, LENG Linyuan, CHEN Zhengxia, JIA Haifeng. LIFE-CYCLE ENVIRONMENTAL AND ECONOMIC BENEFITS ASSESSMENT OF SOURCE CONTROL FACILITIES FOR SPONGE CITY[J]. ENVIRONMENTAL ENGINEERING , 2024, 42(1): 144-149. doi: 10.13205/j.hjgc.202401019
Citation: XU Changqing, LENG Linyuan, CHEN Zhengxia, JIA Haifeng. LIFE-CYCLE ENVIRONMENTAL AND ECONOMIC BENEFITS ASSESSMENT OF SOURCE CONTROL FACILITIES FOR SPONGE CITY[J]. ENVIRONMENTAL ENGINEERING , 2024, 42(1): 144-149. doi: 10.13205/j.hjgc.202401019

LIFE-CYCLE ENVIRONMENTAL AND ECONOMIC BENEFITS ASSESSMENT OF SOURCE CONTROL FACILITIES FOR SPONGE CITY

doi: 10.13205/j.hjgc.202401019
  • Received Date: 2023-03-10
    Available Online: 2024-04-29
  • Sponge city construction is an important measure for urban non-point source pollution control and waterlogging prevention, which has been widely extended in China. To quantify the environmental and economic impacts of the construction and operation stages of sponge city source facilities, aiming at the shortcomings of the current global research on the environmental and economic benefits in sponge city, 5 typical source facilities in a school site were selected as the examples to quantitatively analyze the environmental and economic impacts and benefits and identify key influencing factors by life cycle assessment(LCA) and life cycle costing(LCC) integrated evaluation method(LCA-LCC). The results presented that the construction stage could generate high environmental impact and economic cost, while the operation stage could generate significant environmental and economic benefits. In the operational phase, the payback period of the total environmental impact on runoff and water quality control was within 8 years, and the payback period of total economic cost was within 2 years, and the overall benefits of sponge city source facilities were considerable.
  • loading
  • [1]
    尹澄清.城市面源污染问题:我国城市化进程的新挑战[J].环境科学学报,2006,26(7):1053-1056.
    [2]
    沙永杰,纪雁.新加坡ABC水计划:可持续的城市水资源管理策略[J].国际城市规划,2021,36(4):154-158.
    [3]
    FLETCHER T D,SHUSTER W,HUNT W F,et al.SUDS,LID,BMPs,WSUD and more:the evolution and application of terminology surrounding urban drainage[J].Urban Water Journal,2014,12:525-542.
    [4]
    JIA H F,YAO H R,YU S L.Advances in LID BMPs research and practices for urban runoff control in China[J].Frontiers of Environmental Science & Engineering,2013,7(5):709-720.
    [5]
    中华人民共和国住房和城乡建设部.海绵城市建设技术指南:低影响开发雨水系统构建(试行)[M].北京:中国建筑工业出版社,2015.
    [6]
    印定坤,陈正侠,杨萌祺,等.基于在线监测+模型的海绵城市建设径流水量控制效果研究[J].环境工程,2020,38(4):151-157.
    [7]
    解超,吕彬,王思思,等.基于生命周期思想的透水铺装资源环境影响评价述评[J].环境工程,2021,39(8):197-202

    ,4.
    [8]
    WANG M,ZHANG D,ADHITYAN A,et al.Assessing cost-effectiveness of bioretention on stormwater in response to climate change and urbanization for future scenarios[J].Journal of Hydrology,2016,543:423-432.
    [9]
    VINEYARD D,INGWERSEN W,HAWKINS T R,et al.Comparing green and grey infrastructure using life cycle cost and environmental impact:a rain garden case study in Cincinnati,OH[J].Journal of the American Water Resources Association,2015,51:1342-1360.
    [10]
    丁亚楠,王建国,汤露露.典型雨水收集处理系统的生命周期评价[J].四川环境,2020,39(4):194-199.
    [11]
    SANTOS J,FLINTSCH G,FERREIRA A.Environmental and economic assessment of pavement construction and management practices for enhancing pavement sustainability[J].Resources,Conservation & Recycling,2017,116:15-31.
    [12]
    XU C Q,HONG J L,JIA H F,et al.Life cycle environmental and economic assessment of a LID-BMP treatment train system:a case study in China[J].Journal of Cleaner Production,2017,149:227-237.
    [13]
    全国人民代表大会常务委员会.中华人民共和国环境保护税法[Z].2016.12.
    [14]
    QI C,WANG Q,MA X,et al.Inventory,environmental impact,and economic burden of GHG emission at the city level:case study of Jinan,China[J].Journal of Cleaner Production,2018,192:236-243.
    [15]
    ZHANG R,MA X,SHEN X,et al.PET bottles recycling in China:an LCA coupled with LCC case study of blanket production made of waste PET bottles[J].Journal of Environmental Management,2020,260:110062.
    [16]
    陈碧宜.基于气候变化的低影响开发设施径流量和碳排放控制研究[D].广州:广州大学,2022.
    [17]
    FLYNN K M,TRAVER R G.Green infrastructure life cycle assessment:a bio-infiltration case study[J].Ecological Engineering,2013,55:9-22.
    [18]
    FLYNN K M.Evaluation of green infrastructure practices using life cycle assessment[D].Philadelphia:Villanova University,2011.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (148) PDF downloads(4) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return