Citation: | XU Changqing, LENG Linyuan, CHEN Zhengxia, JIA Haifeng. LIFE-CYCLE ENVIRONMENTAL AND ECONOMIC BENEFITS ASSESSMENT OF SOURCE CONTROL FACILITIES FOR SPONGE CITY[J]. ENVIRONMENTAL ENGINEERING , 2024, 42(1): 144-149. doi: 10.13205/j.hjgc.202401019 |
[1] |
尹澄清.城市面源污染问题:我国城市化进程的新挑战[J].环境科学学报,2006,26(7):1053-1056.
|
[2] |
沙永杰,纪雁.新加坡ABC水计划:可持续的城市水资源管理策略[J].国际城市规划,2021,36(4):154-158.
|
[3] |
FLETCHER T D,SHUSTER W,HUNT W F,et al.SUDS,LID,BMPs,WSUD and more:the evolution and application of terminology surrounding urban drainage[J].Urban Water Journal,2014,12:525-542.
|
[4] |
JIA H F,YAO H R,YU S L.Advances in LID BMPs research and practices for urban runoff control in China[J].Frontiers of Environmental Science & Engineering,2013,7(5):709-720.
|
[5] |
中华人民共和国住房和城乡建设部.海绵城市建设技术指南:低影响开发雨水系统构建(试行)[M].北京:中国建筑工业出版社,2015.
|
[6] |
印定坤,陈正侠,杨萌祺,等.基于在线监测+模型的海绵城市建设径流水量控制效果研究[J].环境工程,2020,38(4):151-157.
|
[7] |
解超,吕彬,王思思,等.基于生命周期思想的透水铺装资源环境影响评价述评[J].环境工程,2021,39(8):197-202
,4.
|
[8] |
WANG M,ZHANG D,ADHITYAN A,et al.Assessing cost-effectiveness of bioretention on stormwater in response to climate change and urbanization for future scenarios[J].Journal of Hydrology,2016,543:423-432.
|
[9] |
VINEYARD D,INGWERSEN W,HAWKINS T R,et al.Comparing green and grey infrastructure using life cycle cost and environmental impact:a rain garden case study in Cincinnati,OH[J].Journal of the American Water Resources Association,2015,51:1342-1360.
|
[10] |
丁亚楠,王建国,汤露露.典型雨水收集处理系统的生命周期评价[J].四川环境,2020,39(4):194-199.
|
[11] |
SANTOS J,FLINTSCH G,FERREIRA A.Environmental and economic assessment of pavement construction and management practices for enhancing pavement sustainability[J].Resources,Conservation & Recycling,2017,116:15-31.
|
[12] |
XU C Q,HONG J L,JIA H F,et al.Life cycle environmental and economic assessment of a LID-BMP treatment train system:a case study in China[J].Journal of Cleaner Production,2017,149:227-237.
|
[13] |
全国人民代表大会常务委员会.中华人民共和国环境保护税法[Z].2016.12.
|
[14] |
QI C,WANG Q,MA X,et al.Inventory,environmental impact,and economic burden of GHG emission at the city level:case study of Jinan,China[J].Journal of Cleaner Production,2018,192:236-243.
|
[15] |
ZHANG R,MA X,SHEN X,et al.PET bottles recycling in China:an LCA coupled with LCC case study of blanket production made of waste PET bottles[J].Journal of Environmental Management,2020,260:110062.
|
[16] |
陈碧宜.基于气候变化的低影响开发设施径流量和碳排放控制研究[D].广州:广州大学,2022.
|
[17] |
FLYNN K M,TRAVER R G.Green infrastructure life cycle assessment:a bio-infiltration case study[J].Ecological Engineering,2013,55:9-22.
|
[18] |
FLYNN K M.Evaluation of green infrastructure practices using life cycle assessment[D].Philadelphia:Villanova University,2011.
|